Design, supply and install subcontractor

School 08, Al Aziziyah: the printed building finished

GGI 3DCP Using local Qatari-based software development, currently under patent process, we printed the largest 3D concrete structure in the world, spanning 20,000 m² in 6 months.

Our hybrid solution: GGI AAC x GGI 3DCP

GGI offers hybrid solutions: irregular geometry is 3D printed, and internal partitions and other walls are built in AAC.

Our hybrid method on a majlis: GGI 3DCP prints the curved walls, AAC robots stand the tongue and groove panels at the back Our hybrid method on a majlis: GGI 3DCP prints the curved walls, AAC robots stand the tongue and groove panels at the back

Printing a majlis on site, concept

On our projects GGI 3DCP is run by two engineers and five labourers and prints 130 m² a day. There is zero waste in printing, and waste material is recycled back into the mix.

On our projects each GGI AAC robot is run by one engineer and one labourer and installs 100 m² a day, with minimal waste.

Material specifications
GGI 3DCP GGI AAC
Compressive strength ≥ 35 MPa at 28 days 4 MPa minimum
Density 1,900–2,100 kg/m³ 550–650 kg/m³
Thermal conductivity 1.8–2.0 W/(m·K) 0.12 W/(m·K)

Why build with GGI

Record

Printed walls between tall windows, School 08, Al Aziziyah
School 08, Al Aziziyah
  • School 08 20,000 m² printed in six months for Ashghal

Speed

Lusail Commercial Boulevard buildings with AAC cladding
Lusail Commercial Boulevard, Lusail

In 2021 and 2022 we installed AAC walls for two Barwa developments: Madinatna, covering 1,141,689 m², and Argentine Village, covering 773,457 m².

We installed 64,000 m² of AAC façade on the 18 buildings of Lusail Commercial Boulevard in 167 working days, with a peak of 655 m² in one day.

Clients

Shura Council, Al Sadd
Shura Council, Al Sadd

Ashghal, Hamad International Airport, the Shura Council, Qatar Foundation, the Supreme Committee for Delivery & Legacy and Private Engineering Office build with GGI.

From 24 towers at The Pearl in 2007 to School 08 in 2026, more than 180 projects carry GGI AAC.

Projects in Qatar

Who we worked with

Clients

  • Qatar National Olympic Committee
  • Ashghal
  • Gulf Warehousing
  • Lulu Hypermarket
  • Qatar Airways
  • Al Meera
  • Barwa Real Estate Group
  • Lusail Real Estate Company
  • Pearl Qatar
  • Qatar Foundation
  • ABK for Projects & Development
  • Al Jaber
  • Alfardan Group
  • Arabian Technical Petroleum Service (ATPS)
  • DoubleTree by Hilton
  • Hilton
  • Hyatt Plaza
  • InterContinental Hotels & Resorts
  • Nozul Real Estate
  • Ooredoo
  • Oryx GTL
  • Qatari Diar
  • Six Construct
  • Supreme Committee for Delivery & Legacy
  • United Equipment
  • Vision School

Consultants and designers

  • Arab Engineering Bureau
  • Dar Al-Handasah
  • Qatar Design Consortium
  • Al Sadd Consulting Engineering
  • AECOM
  • ASTAD Project Management
  • Dara Engineering Consultants
  • Diwan Architects Engineers
  • Hill International
  • KEO International Consultants
  • Louis Berger
  • MZ & Partners
  • AtkinsRéalis
  • Eng. Adnan Saffarini Office
  • GHD
  • Al Baker Architects
  • Arup
  • Aurecon
  • DCB
  • Erga
  • Gensler
  • Halcrow
  • James Cubitt
  • KENTZ
  • LACASA Architects & Engineering Consultants
  • Meinhardt
  • Nabil Gholam Architects
  • Petra Design
  • Shaker Consultancy Group
  • United Consultants

Main contractors

  • Redco Construction, Almana
  • UrbaCon Trading & Contracting (UCC)
  • Al Muftah
  • Al Safwa Trading & Contracting
  • Harinsa Qatar
  • Crafters
  • Al Sraiya Group
  • Medgulf Construction
  • Aktor
  • Al Balagh Trading & Contracting
  • Al Kifah Contracting
  • Amana Contracting
  • CRC Engineering Co. for Construction & Development
  • GET Generic Engineering Technologies
  • L&T
  • Lotus Trading & Contracting
  • Redco International
  • Sinohydro