Design, supply and install subcontractor
Who we are
Go Green International has designed, supplied and installed green building systems across Qatar and the Gulf since 1999: Autoclaved Aerated Concrete (AAC) panels and blocks, Modified Clay Material (MCM) and terracotta facades, and 3D Concrete Printing (3DCP), with our own engineers and software developed at GGI. Our expertise spans 27 years.
- Inc. Arabia Best in Business Awards 2026, Architectural Innovation
- ISEM 2025, Gold Sponsor
- 180+ Autoclaved Aerated Concrete (AAC) projects
- 650+ Modified Clay Material (MCM) projects
- 49 Terracotta projects
GGI 3DCP Using local Qatari-based software development, currently under patent process, we printed the largest 3D concrete structure in the world, spanning 20,000 m² in 6 months.
Our hybrid solution: GGI AAC x GGI 3DCP
GGI offers hybrid solutions: irregular geometry is 3D printed, and internal partitions and other walls are built in AAC.
Printing a majlis on site, concept
Why build with GGI
-
People per machine
GGI 3DCP: 7 (2 engineers, 5 labourers)
GGI AAC: 2 (1 engineer, 1 labourer)
Fewer people on site: less labour and fewer labour risks
-
Output per day
GGI 3DCP: 130 m²
GGI AAC: 100 m²
From our own projects
-
Waste
GGI 3DCP: Zero in printing
GGI AAC: Minimal
GGI 3DCP waste is recycled back into the mix, and AAC leaves minimal waste
Material specifications
| GGI 3DCP | GGI AAC | |
|---|---|---|
| Compressive strength | ≥ 35 MPa at 28 days | 4 MPa minimum |
| Density | 1,900–2,100 kg/m³ | 550–650 kg/m³ |
| Thermal conductivity | 1.8–2.0 W/(m·K) | 0.12 W/(m·K) |
Projects in Qatar

Lusail Commercial Boulevard
AAC cladding panels on 18 buildings
Project facts
- Client
- Lusail Real Estate Company
- Main contractor
- Redco Construction – Almana
- Consultant
- KEO International Consultants
- GGI scope
- Design, supply and install: partition panels, cladding panels
- Year
- 2019–2022

Lulu Hypermarket
Shaped AAC cladding façade
Project facts
- Main contractor
- Shannon Engineering Co.
- GGI scope
- Design, supply and install: partition panels, cladding panels, coating and painting

Doha Oasis
AAC cladding
Project facts
- Main contractor
- Redco Construction – Almana
- Consultants
- AECOM, Arup, Aurecon, Gensler, MZ & Partners, Nabil Gholam Architects, NEB, Qatar Design Consortium
- GGI scope
- Supply and install: partition panels, cladding panels, blocks

Barwa Madinatna
7,000 apartments
Project facts
- Client
- Barwa Real Estate Group
- Main contractor
- UrbaCon Trading & Contracting (UCC)
- Consultant
- Dara Engineering Consultants
- GGI scope
- Design, supply and install: cladding panels, horizontal panels and bands, blocks, parapets, coating and painting
- Year
- 2020–2022

Barwa Argentine Village
Project facts
- Client
- Barwa Real Estate Group
- Main contractor
- UrbaCon Trading & Contracting (UCC)
- Consultant
- Dara Engineering Consultants
- GGI scope
- Design, supply and install: cladding panels, horizontal panels and bands, blocks, parapets, coating and painting
- Year
- 2021–2022

Ashghal PPP Schools
Work on 11 of the 14 schools: AAC on 10, and 3D printed walls and columns with AAC at School 08
Project facts
- Client
- Ashghal
- Main contractor
- UrbaCon Trading & Contracting (UCC)
- Year
- 2026

Villaggio Mall extension
AAC cladding on the mall extension
Project facts
- Client
- REPTCO – Al Rabban
- Main contractor
- Al Safwa Trading & Contracting
- Consultant
- MZ & Partners
- GGI scope
- Supply and install: cladding panels, roof slabs, lintels, blocks

ABK, 6 residential buildings
AAC walls and partitions
Project facts
- Client and main contractor
- ABK for Projects & Development
- Consultant
- Eng. Adnan Saffarini Office
- GGI scope
- Design, supply and install: partition panels, cladding panels